高潮又爽又黄又无遮挡动态图_精品亞洲一區二區三區在線播放_午夜国产成人自拍_国产精品福利影院在线观看_亚洲无码2020每日更新_蜜臀av国内精品久久久_十分钟免费视频高清在线观看_中日韩一级特黄无码毛片蜜臀

Home > Solution > Case
Solution Case

Key project - Hainan West Ring Railway

 
 

The newly- built Hainan West Ring Railway has a length of 345.213 km. It starts from Beikou in the north, goes across west old city, Fushan, Lingao, Silver Beach, Yangpu, Kaizu, Qiziwan, Dongfang, Jianfeng,Huangliu, Ledong and Yacheng station, connects with Fenghuang station and arrives at Sanya station. It will form Ring Island Railway with East Ring Railway after after completed.


The full line GSM-R wireless communication system adopts the BSCe3/GSM9000 type digital mobile communication base station subsystem equipment provided by Ticom Tech and KAPSCH, including 73 sets of online equipment GSM9000 base station, 1 set of BSCe3 base station controller, 1 set of TCUe code speed converter, 1 set of PCUSN packet control unit, and 1 set of OMC-R network management system.The whole line GSM-R digital mobile communication base station subsystem equipment had been officially put into use in December 2015. So far, the equipment has been running stably and reliably, the field strength has been well covered, and the network management system has run normally. All the functional indexes completely meet the relevant requirements of the former Ministry of Railways and the Ministry of Information Technology, thus ensuring the safe and efficient operation of Hainan West Ring Railway.


 
 
 

Previous:NO

Next:Turkmenistan - East and west line